All prices CAD, before tax. Figures are for one part; quantity multiplies them. Customer details live in Square — not here. Rates start as planning assumptions; edit them on the Rates tab.
Job inputs
Quote form
Materials
Grams for one part, from the slicer. Up to three materials. Cost comes from Rates.
Breakdown
Price breakdown (whole job)
Square estimate
Type these into Square
Invoices → Estimates → Create estimate. Skip any row marked skip. Let Square add HST only once you are registered.
| Item | Description | Qty | Price each | Line total | Copy |
|---|
- Create the estimate in Square and add the customer there.
- Add Design / Printing / Hardware using the description, qty and price each above.
- Confirm Square’s subtotal matches Square subtotal (it can be a few cents higher because per-part prices round up).
- Tax: while not HST-registered, add no tax. Once registered, use 13% HST in Square — never type tax as a line item.
- Set expiry to —, paste the revision note, request the deposit, then send.
Assumptions
Rates
Test rates for planning — not market prices. Validate with real paid jobs. Saved in this browser (pf-quote-rates-v1).
Filament — landed cost per kg
| Material | C$ / kg | C$ / g | Note |
|---|
Landed cost = price + freight + any tax you can’t claim back. A blank material shows a warning on the Quote tab.
Local only
Saved quotes
Stored in this browser only (pf-quote-history-v1). Not synced.